Emtel’s UPS applications for data centers ensure uninterrupted power supply. This solution optimizes floor space and loading with a 7.1 KWH capacity, compact dimensions(1409 x 565 x 745 mm), and quick installation within 4 hours. It guarantees reliability and efficiency in critical data center operations.
Result: Reduced Opex
Result: Guaranteed Backup
Result: Reduced Opex
Result: Reduced Capex & Rental
Result: Faster Mobilisation & Backup Availability
Result: Better ROI
Supports remote control of DG
Configurable with solar charge controller, bypass cabinet and stand- alone.
Peak- shaving, backup, use the system however you want it
Project Detail
System Size
(8) x 7.1 kWh ENCAP Modules (Total: 56.8 kWh @ 48 V)
Rack Size
800x800x2150 (W x D x H)mm
Voltage Range
44 V to 54 V
Cooling System
Not Required
Protection Features
Overvoltage, Overcurrent, Short Circuit, Thermal Protection
Monitoring & Communication
CANBUS / Modbus / ENCONNECT
Project Detail
Total Racks
2
Total Capacity
200 KWh
DC Voltage
500 V
Backup Time
30 Mins
UPS
Schnider 400 KVA
Monitoring & Communication
CANBUS / Modbus / ENCONNECT
Project Detail
Rated Capacity
100 kWh
Nominal Voltage
520 Vdc
Rated Power
350 KW in 5mins
Efficiency
≥ 95%
Response Time
Few Nano Seconds
Cooling System
Not Required
Protection Features
Overvoltage, Overcurrent, Short Circuit, Thermal Protection
Monitoring & Communication
CANBUS / Modbus / ENCONNECT
VRLA, 2 V, 192 cells, 600 Ah
Description
Dimension
Data
Floor Space
Floor Loading
Installation Time
5 Days
ENCAP 8 No. 10 kWh
Description
Dimension
Data
Floor Space
Floor Loading
Installation Time
4 Hours
Downloadable Resources
Stay tuned for more exciting updates and developments from Emtel Group as we continue to pioneer the future of green energy products and solutions.