Backup Application – Ensuring Reliability

>

Super Capacitor Based Energy Storage

Power & Energy

Globe Telecom Cell Site - Philippines

Lorem ipsum dolor sit amet consectetur. Dignissim consequat aenean odio pretium vel. Sodales lectus ipsum rhoncus tellus nibh cursus enim euismod. In donec urna aliquam nisl ornare euismod risus. Et sed scelerisque ultricies scelerisque semper condimentum vitae feugiat ligula. Integer non tellus donec et. Feugiat sit in urna elit lectus. Morbi bibendum et viverra mi sit hendrerit est. Felis a enim ipsum tristique ipsum. Duis et dolor at tortor.
Duis egestas viverra habitant nibh feugiat malesuada ornare mauris. Et mi ultricies massa lectus suspendisse rhoncus tincidunt ut ultricies. Eu odio id in vel volutpat. Fames orci lectus et aliquam suscipit amet molestie est morbi. Urna dictumst molestie magna posuere dignissim sed. Felis mauris feugiat at volutpat risus posuere id volutpat. Enim gravida turpis nulla consectetur in malesuada. Risus consectetur sed at nisi laoreet vulputate eget maecenas. Donec hac ac condimentum nec quam.

The project’s success underscores Emtel Group’s commitment to pioneering innovative solutions tailored to meet the evolving needs of the telecommunications industry. Through their Solar Hybrid Application, they have demonstrated the potential for renewable energy to drive cost-effective and environmentally friendly operations, setting a precedent for future advancements in off-grid site management.

Discover Before & After of Backup Application at Globe Telecom Cell Site, Philippines

Description

Site Location

Data

Outdoor

Load

4.5kW

DieselGenerator

30kVA

Mode

Off-grid

DG Run Hours (Daily)

24Hrs

DG running belowi n-efficiency point consumes  1L/kWh (approx.). Therefore, Consumption  (L/Month)

3,240L

Diesel Cost/Month(@USD0.56/L)

1,814.40

MaintenanceCost/Month(USD)

245

OPEX/ Month(USD)

2,059.40

OPEX/Year(USD)

24,712.80

Description

Proposed Energy Storage

Data

21.3kWh

SIRIUSModules

3 X 7.1kWh

Module Voltage

48V

Sirius Module Charging Time Capacity

35mins

Actual Charging Time of Sirius per Cycle Based on Available DG Capacity

1.4 hours

Charge Cycles per Day (DG operation)

4

DG Run time per Day (mins)

5.6

Loads operation on SIRIUSESS/Day

18.4Hrs

DieselConsumption @0.27L/kWh(L/Month)

1,193.25

Diesel Cost/Month@USD0.56/L(USD)

668.22

Maintenance Cost/Month–Reduced(USD)

125

OPEX /Month–Reduced (USD)

793.22

OPEX/Year – Reduced (USD)

9,518.64

Downloadable Resources