Backup Application – Ensuring Reliability

>

Super Capacitor Based Energy Storage

Power & Energy

Globe Telecom Cell Site - Philippines

The project’s success underscores Emtel Group’s commitment to pioneering innovative solutions tailored to meet the evolving needs of the telecommunications industry. Through their Solar Hybrid Application, they have demonstrated the potential for renewable energy to drive cost-effective and environmentally friendly operations, setting a precedent for future advancements in off-grid site management.

Discover Before & After of Backup Application at Globe Telecom Cell Site, Philippines

Description

Site Location

Data

Outdoor

Load

4.5kW

DieselGenerator

30kVA

Mode

Off-grid

DG Run Hours (Daily)

24Hrs

DG running belowi n-efficiency point consumes  1L/kWh (approx.). Therefore, Consumption  (L/Month)

3,240L

Diesel Cost/Month(@USD0.56/L)

1,814.40

MaintenanceCost/Month(USD)

245

OPEX/ Month(USD)

2,059.40

OPEX/Year(USD)

24,712.80

Description

Proposed Energy Storage

Data

21.3kWh

SIRIUSModules

3 X 7.1kWh

Module Voltage

48V

Sirius Module Charging Time Capacity

35mins

Actual Charging Time of Sirius per Cycle Based on Available DG Capacity

1.4 hours

Charge Cycles per Day (DG operation)

4

DG Run time per Day (mins)

5.6

Loads operation on SIRIUSESS/Day

18.4Hrs

DieselConsumption @0.27L/kWh(L/Month)

1,193.25

Diesel Cost/Month@USD0.56/L(USD)

668.22

Maintenance Cost/Month–Reduced(USD)

125

OPEX /Month–Reduced (USD)

793.22

OPEX/Year – Reduced (USD)

9,518.64