Hybrid Application – Optimizing Energy Use

>

Super Capacitor Based Energy Storage

Power & Energy

AT&T Off-Grid Solar Site, California - USA

Spearheaded a groundbreaking project in collaboration with AT&T, focusing on enhancing the efficiency and sustainability of off-grid sites in California, USA. The project involved the development of a sophisticated Hybrid Application system tailored to meet the specific demands of the site.
With a 6KWDC Load, the system integrated a robust infrastructure comprising a 15kWp Solar PV array, complemented by a 60kVA Diesel Generator (DG) for backup power. The heart of the system lay in the deployment of 12 cutting-edge 3.55kWh, 48VDC modules, totalling an impressive 42.6kWh storage capacity.

One of the primary objectives of the project was to significantly reduce DG runtime, thereby minimizing operational costs and environmental impact. Through meticulous design and optimisation, Emtel Group achieved a remarkable reduction in DG runtime, slashing it from 6 hours to a mere 50 minutes. This achievement not only represented a substantial improvement in efficiency but also translated into tangible Opex savings for AT&T.

The Hybrid Application developed by Emtel Group stands as a testament to innovation and sustainability in the field of off-grid power solutions. By harnessing the power of renewable energy sources and advanced storage technologies, the project exemplifies a paradigm shift towards greener, more efficient energy systems, setting a new standard for off-grid site operations.

Discover Before & After of Hybrid Application at AT&T Off-Grid Solar Site, California - USA

Description

Site Location

Data

Outdoor

Load

6kW

Mode

Hybrid

DG Run Hours (Daily)

6Hrs

DG running belowi n-efficiency point consumes  1L/kWh (approx.). Therefore, Consumption  (L/Month)

1,080L

Diesel Cost/Month(@USD0.56/L)

427

OPEX/ Month(USD)

1031

OPEX/Year(USD)

12,372

Description

Proposed Energy Storage

Data

42.6kWh

SIRIUSModules

12X3.55kWh

Module Voltage

48V

Sirius Module Charging Time Capacity

1.1h

Charge Cycles per Day (DG operation)

0.7

DG Run time per Day (mins)

50mins

Loads operation on SIRIUSESS/Day

5.2h

DieselConsumption @0.27L/kWh(L/Month)

291.6L

Diesel Cost/Month@USD0.56/L(USD)

163.3

Maintenance Cost/Month–Reduced(USD)

115.3

OPEX /Month–Reduced (USD)
278.6

278.6

OPEX/Year – Reduced (USD)

3,343.2