Emtel’s UPS Applications for Data Centers ensure uninterrupted power supply. This solution optimizes floor space and loading with a 7.1 KWH capacity, compact dimensions(1409 x 565 x 745 mm), and quick installation within 4 hours. It guarantees reliability and efficiency in critical data center operations.
Result: Reduced Opex
Result: Guaranteed Backup
Result: Reduced Opex
Result: Reduced Capex & Rental
Result: Faster Mobilisation & Backup Availability
Result: Better ROI
VRLA 2V, 192 Cells – 600AH
Description
Dimension
Data
925 (H) x 7656 (W) x 561 (D)
Floor Space
4.28 Square Meter
Floor Loading
3000 Kg/Square Meter
DG Run Hours (Daily)
6Hrs
Installation Time
5 Days
ENCAP 8 No. 7.1kWh
Description
Dimension
Data
1409 (H) x 565 (W) x 745 (D)
Floor Space
0.420 Square Meter
Floor Loading
1300 Kg/Square Meter
Installation Time
4 Hours
Downloadable Resources
info@emtelcommunications.com
HQ: LIU 1, Office # 14, Dubai Silicon Oasis, Dubai UAE
info@emtelcommunications.com
458, Block-B, Canal View Society, Lahore, Pakistan
info@emtelcommunications.com
3391 Tolmie Avenue, Richmond, BC V7C 5R1 3567 Bala Drive Mississauga, Ontario L5M 7N2